Four common beliefs about heat pumps and listed houses, set against what the permitted development Order and the 1990 Act actually say.
Some, not all. Permitted development does not cover an air source heat pump on a listed house or anywhere in its curtilage, and listed building consent is a separate question for every type of heat pump. Ask your council before you order anything.
New to this? Start with Can I Insulate or Fit a Heat Pump in a Listed Building?
Is a heat pump a like-for-like swap for a boiler?
Nothing in the law treats it as one. Section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990 asks whether works would affect the building's character as a building of special architectural or historic interest.
An outdoor unit, the pipework that runs to it and any new hole through an old wall are all works for your council to judge. Their size and their energy rating are not the test.
Does permitted development cover an air source heat pump?
Not on a listed building. Class G of Part 14 of the General Permitted Development Order grants planning permission for some air source heat pumps, and then lists the cases it does not cover. One of them reads: "the air source heat pump would be installed on a building or on land within the curtilage of the dwellinghouse or the block of flats if the dwellinghouse or the block of flats is a listed building".
That wording takes in a shed, a garage or a patch of lawn in the curtilage, as well as the house itself. If you are unsure whether an outbuilding or a wall counts, the curtilage post explains how the question is answered.
The same exclusion shut the door on solar panels, as the solar panels post set out. The Order is amended from time to time, so read the live text on legislation.gov.uk rather than a summary, including this one.
Is a ground or water source heat pump treated differently?
On the face of the Order, yes, for planning permission only. Classes C and D cover ground source and water source heat pumps within the curtilage of a dwellinghouse. When I opened them on 9 November 2026, neither carried a paragraph excluding listed buildings, unlike Class G.
That does not mean the work is allowed on a listed building. Planning permission and listed building consent are separate questions, and pipework entering the house, a plant room or a trench close to the walls may be work the council wants to see. Whether any of it falls in the curtilage of a listed building is a matter of fact for your council.
What does the Act add to the Order?
Section 7 says no person shall execute works to alter a listed building in a way that would affect its character, unless the works are authorised. The section as I read it carries no exception for work that the planning rules happen to allow, although it is "subject to the following provisions of this Act", so your council has the last word on how it applies.
Where planning permission is also needed, section 66 asks the council to have special regard to the desirability of preserving the building or its setting. A statement of what is significant about the building helps the council see what a heat pump would touch.
Can I fit it now and ask afterwards?
Section 7 puts the permission first: works are not to be carried out unless they are authorised. If a unit has already gone in, the retention consent post sets out what the Act provides and how an application is built.
The cheaper course is to ask before the installer books a date. A council can tell you what it wants to see long before any equipment is bought.
In what order should you settle things before ordering?
- Name the type. Air source, ground source or water source decides which class of the Order a council will look at.
- Find the listing and the curtilage. Check what is listed and whether the proposed spot lies in its curtilage.
- Draw the route. Mark the position of the unit, the pipe runs and every opening through the fabric.
- Ask your council. Put the drawings to the conservation officer and ask whether listed building consent and planning permission are both needed.
- Describe the significance. Set out what matters about the building and how the proposal sits against it.
- Wait for the decision. Order equipment and book installers only once the answer is in writing.
What can an architect usefully do before you apply?
An architect can show a council where a unit could stand, and the route a pipe could take, before the council has to ask. A clear drawing and a short account of the building's significance tend to turn a vague worry into a specific question.
I would rather an owner spent an evening on that than a month in correspondence. A tool such as HeritageAI's Preliminary Planning and Heritage Appraisal (PPHA), which the AI generates automatically from the details you give, can be a first read to help you plan. It is not professional advice and no person reviews it before it is sent.
There has rarely been more choice in quiet, compact equipment, and more people who care about getting old buildings warm without harming them. That is a hopeful place to start from.