A council letter about your listed building: six terms explained in plain English

A glossary of the terms in a council letter about works to a listed building: contravention, enforcement notice, temporary stop notice, time limits, retention and appeal.

Plain white and cream envelopes and blank paper tags laid flat in an overlapping patternPhoto by Joanna Kosinska on Unsplash

A council letter about works to a listed building usually turns on a few legal terms. In short: the council thinks work was done without consent, or against a condition, and the Act sets out what it can do and what you can do in reply. Six terms follow.

New to this? Start with Do I Need Listed Building Consent?

Nothing here is legal advice, and a letter of this kind is a good moment to speak to a solicitor as well as a heritage professional. What follows is a plain reading of the rules, section by section, so the words stop being frightening.

What does “contravention” mean in a council letter?

The council uses the word for a breach of section 9 of the Planning (Listed Buildings and Conservation Areas) Act 1990. Section 9 makes two things an offence: carrying out works to a listed building that need consent without having it, and failing to comply with a condition attached to a consent that was granted.

A person found guilty on summary conviction can face up to six months in prison, a fine, or both. On conviction on indictment the prison term can reach two years, with a fine as well or instead.

The Act also gives a defence for works that were urgently necessary for safety, health or the preservation of the building. It is narrow: the works must be the minimum immediately necessary, repair or temporary support must not have been practicable, and the council must have been told in writing, with detailed reasons, as soon as reasonably practicable.

What is a listed building enforcement notice?

It is the formal document in which the council says what is wrong and what it wants done. Section 38 lets the council issue one where works have been or are being carried out in breach of section 9, if it considers it expedient having regard to the effect on the building’s special architectural or historic interest.

The notice has to name the alleged contravention and require steps of one of three kinds:

  • Restore: put the building back to its former state.
  • Alleviate: where restoring is not reasonably practicable or is undesirable, carry out other specified works to lessen the effect of what was done.
  • Comply: bring the building to the state it would have been in had the terms and conditions of any consent been followed.

The notice must state the date it takes effect and the period for each step. A copy goes to the owner and occupier, and to anyone else with an interest the council thinks is materially affected, no later than 28 days after issue and no later than 28 days before the notice takes effect.

A timber-framed house with dark oak posts and braces, white infill panels and leaded windows, standing on a rubble stone base
A timber-framed house on a stone base. Where works were done without consent, the first of the three kinds of step a notice can require is to put the building back to its former state.Photo by T on Unsplash

Can a notice be withdrawn or relaxed?

Yes. Under section 38 the council can withdraw a notice, without losing the power to issue another, or waive or relax a requirement, including by extending the time allowed. It can do either whether or not the notice has taken effect, and it must tell everyone who was served.

What is a temporary stop notice?

Government planning guidance says councils can issue temporary stop notices for suspected breaches of listed building control, under sections 44AA to 44AC of the 1990 Act. The guidance describes the powers as broadly similar to those for ordinary planning control.

This post does not set out the detailed rules for these notices. If one arrives, the letter states its own terms, and those are what to read first.

Is there a time limit on enforcement?

There are no time limits for issuing listed building enforcement notices, says government guidance, and that is one of the differences from ordinary planning enforcement. It adds that the time that has passed since the apparent breach may be a relevant consideration when the council weighs whether a notice is expedient.

"There are no time limits for issuing listed building enforcement notices"

This is why an old, unauthorised alteration can still come up when a house is sold or when new works are planned. Asking what past work was authorised, before you buy or build, is cheaper than discovering it in a letter.

What is consent for retention?

Section 8(3) deals with works carried out without consent. If the council or the Secretary of State later grants written consent for the retention of those works, the works are authorised from the date that consent is granted.

The wording matters. The works are authorised from the grant, not backdated, so it does not undo the fact that they were done without consent, and the Act does not promise the council will grant it. Asking for it is one of the routes to talk through with a professional.

How does an appeal against a notice work?

Section 39 lets a person with an interest in the building, or a relevant occupier, appeal to the Secretary of State. The appeal must be made before the date on which the notice is due to take effect, by written notice, post or electronic communication, and it needs a written statement of the grounds.

The grounds in the Act include these, which are quoted closely:

  • The listing: that the building is not of special architectural or historic interest.
  • The facts: that the matters alleged to be a contravention have not occurred, or that they do not amount to a contravention.
  • The consent: that listed building consent ought to be granted, or that a condition ought to be discharged or replaced.
  • The notice itself: that copies were not served as required, or that the time allowed for a step is too short.
  • The steps: that the requirements go further than is necessary, or that the steps would not serve their purpose.

Once an appeal is brought, the notice is generally of no effect until the appeal is decided or withdrawn. That is subject to a separate power in section 65 of the Act, which this post does not cover.

What should you do first with the letter itself?

  1. Read what kind of document it is. A letter asking for information is not a notice, and a notice will say what it is, when it takes effect and what steps it requires.
  2. Write down the dates. Note the date of issue, the date it takes effect, and the period for each step. The appeal deadline is tied to the date of effect.
  3. Keep your records. Gather consents, conditions, drawings and dated photographs of the building before and after the works.
  4. Take advice early. A solicitor can advise on the legal position, and a heritage professional on the building and on what a consent application would need.
  5. Reply to the council in writing. Do not ignore a letter, and ask the officer to confirm in writing what is alleged.

A breach of a condition is one of the two offences in section 9, and the earlier post on what the rules say about conditions is the background to it. A few days ago the post on curtilage showed how a garden wall or outbuilding can sit inside the listing without being named, which is another way a letter arrives.

HeritageAI’s Preliminary Planning and Heritage Appraisal (PPHA) is a first read of a project, made by the AI from what you tell it and sent by email. It helps you plan and is not professional advice; no person reviews each one before it goes out, and a list entry number you give is checked against the National Heritage List for England. See the sample PPHA for how one reads.

There is reason to be hopeful. Councils, owners and craftspeople mostly want the same outcome, a listed building that is cared for, and clear, early records make that conversation far easier than a letter ever does.

If you have had a letter, or want to check your own works before one arrives, Book a 30-minute call with Giles and ask for a first read on your project.

Working on a listed building?

Book a 30-minute call and we'll look at your building with you. Or message us on WhatsApp.

Calls and WhatsApp are answered by an architect at HeritageAI.

Or sign up at no cost and run it yourself →

Text © 2026 DoAnythingNow Ltd, trading as HeritageAI. You’re welcome to quote a short extract with a credit and a link back. Photographs belong to their photographers and are credited beneath each image.